Stormwater Management Plan – 41 Evergreen Avenue, Loganlea

Project location

  • 41 Evergreen Avenue, Loganlea
  • Near the corner of Polyanna Court and Evergreen Avenue
  • Lot 107 on RP112930

Project summary

  • Subdivision into four lots
  • Creation of easements for lots
  • Design and construction of crossover for new lots
  • Constructing new water and sewer infrastructure
  • Constructing new stormwater infrastructure

Our role

CWD Group undertook the following scope of works for the project at 41 Evergreen Ave, Loganlea:

1. Undertake site visit to gain appreciation of site conditions
2. Liaise with project team as needed
3. Address relevant codes relating to the engineering items below
4. Stormwater Quantity Assessment:

  • Undertake existing hydrologic calculations to determine runoff from the site from the 2, 5, 10, 20, 50 and 100 year ARI event
  • Undertake developed hydrologic calculations to determine runoff from the site from the 2, 5, 10, 20, 50 and 100 year ARI event
  • Determine impacts of the development of peak discharges from the site
  • Define a strategy to ensure no adverse impacts on stormwater runoff for neighbouring properties (including detention)
  • Determine lawful point of discharge
  • Address integration of the site into existing stormwater infrastructure
  • Prepare content for inclusion into the stormwater management plan, which will be supervised and certified an RPEQ engineer

5. Sewer and Water Concepts:

  • Liaise with Logan Water regarding water and sewer connections
  • Prepare conceptual plans of the proposed sewer and water connections
  • Ensure designs adhere with SEQ code and unity water guidelines
  • Documentation of designs supervised and certified by RPEQ engineer

6. Access/Handle Conceptual Plan:

  • Ensure proposed access handle characteristics are consistent with the planning scheme and other relevant guidelines
  • Prepare typical section of proposed access handle
  • Documentation of designs supervised and certified by RPEQ engineer
  • Exclusions

7. The following are excluded from the scope of this proposal:

  • Bank erosion and stability analysis
  • Site survey
  • Cost of council or Queensland State Government data

The project

CWD Group handed over a completed and professional product to the client, to the satisfaction of all parties involved. All documentation and designs were created in accordance with the relevant manuals and guidelines and are therefore consistent with the Logan City Planning Scheme 2015.

Value added by CWD Group

Through CWD Group’s ability to understand and navigate council requirements, and communicate with the relevant authorities regarding the project’s specific needs, the process was completed in a timely and professional manner.

Due to our understanding of engineering standards and the implications on cost, time and construction, we were able to skillfully resolve constraints that related to construction and infrastructure, resulting in a pleasing and efficient project outcome.

For civil engineering expertise at your fingertips - get in touch!